enabled, line calls move from a telephone DN button to a line button after they are answered. After the call is answered, the DN button is cleared to receive another call. With this operation the DN acts as an answer button for the phone. This only applies if the line answered has a CO, GCO, or Pooled line button appearance on the phone. If disabled, line calls remain on the DN after they are answered. 106 Day/Night Mode Day of Week Mapping 106, Hold The Day of the Week schedule defines each day as the type of day the schedule shall follow. These types of days are called Work Day, Non-work Day, and Holiday. Each day of the week can be classified. 106-00 Tenant Number n = Enter 1~8 Select the Tenant number for which the daily schedules will be configured. 106-01 Monday n = 1. Work Day (default) 2. Non-Work 3. Holiday Enter the type of day to follow for daily schedule. 1- Work Day; 2- Non-Work Day; or 3- Holiday. 106-02 Tuesday n = 1. Work Day (default) 2. Non-Work 3. Holiday Enter the type of day to follow for daily schedule. 1- Work Day; 2- Non-Work Day; or 3- Holiday. 106-03 Wednesday n = 1. Work Day (default) 2. Non-Work 3. Holiday Enter the type of day to follow for daily schedule. 1- Work Day; 2- Non-Work Day; or 3- Holiday. 106-04 Thursday n = 1. Work Day (default) 2. Non-Work 3. Holiday Enter the type of day to follow for daily schedule. 1- Work Day; 2- Non-Work Day; or 3- Holiday. 106-05 Friday n = 1. Work Day (default) 2. Non-Work 3. Holiday Enter the type of day to follow for daily schedule. 1- Work Day; 2- Non-Work Day; or 3- Holiday. 106-06 Saturday n = 1. Work Day 2. Non-Work (default) 3. Holiday Enter the type of day to follow for daily schedule. 1- Work Day; 2- Non-Work Day; or 3- Holiday. 106-07 Sunday n = 1. Work Day 2. Non-Work (default) 3. Holiday Enter the type of day to follow for daily schedule. 1- Work Day; 2- Non-Work Day; or 3- Holiday.